首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   70篇
  免费   33篇
  2022年   1篇
  2021年   2篇
  2020年   8篇
  2019年   5篇
  2018年   3篇
  2017年   1篇
  2016年   5篇
  2015年   1篇
  2014年   5篇
  2013年   1篇
  2012年   3篇
  2011年   8篇
  2010年   2篇
  2009年   2篇
  2008年   7篇
  2007年   4篇
  2006年   7篇
  2005年   5篇
  2004年   5篇
  2003年   2篇
  2002年   3篇
  2001年   5篇
  2000年   2篇
  1999年   2篇
  1998年   7篇
  1997年   2篇
  1996年   1篇
  1995年   1篇
  1994年   3篇
排序方式: 共有103条查询结果,搜索用时 15 毫秒
71.
This paper considers a two-agent scheduling problem with linear resource-dependent processing times, in which each agent has a set of jobs that compete with that of the other agent for the use of a common processing machine, and each agent aims to minimize the weighted number of its tardy jobs. To meet the due date requirements of the jobs of the two agents, additional amounts of a common resource, which may be in discrete or continuous quantities, can be allocated to the processing of the jobs to compress their processing durations. The actual processing time of a job is a linear function of the amount of the resource allocated to it. The objective is to determine the optimal job sequence and resource allocation strategy so as to minimize the weighted number of tardy jobs of one agent, while keeping the weighted number of tardy jobs of the other agent, and the total resource consumption cost within their respective predetermined limits. It is shown that the problem is -hard in the ordinary sense, and there does not exist a polynomial-time approximation algorithm with performance ratio unless ; however it admits a relaxed fully polynomial time approximation scheme. A proximal bundle algorithm based on Lagrangian relaxation is also presented to solve the problem approximately. To speed up convergence and produce sharp bounds, enhancement strategies including the design of a Tabu search algorithm and integration of a Lagrangian recovery heuristic into the algorithm are devised. Extensive numerical studies are conducted to assess the effectiveness and efficiency of the proposed algorithms.  相似文献   
72.
全局仿射变换条件下图像不变量提取新方法   总被引:2,自引:0,他引:2       下载免费PDF全文
从仿射几何理论出发,提出了一种全局仿射变换条件下图像特征不变量构造的新方法.利用仿射区域划分获取一组扩展质心集合作为图像特征点集;求解特征点集的凸包,根据扩展质心的性质将凸包顶点均匀组合成若干特征区域;利用仿射几何性质构造了有效的仿射不变量.实验对该方法进行了全面的比较分析,以验证所构造的不变量更具稳定性和高时效性.  相似文献   
73.
74.
为提高图像配准算法的精度和适应能力,将超图约束和改进归一化互相关方法应用于图像配准。利用Hessian-Affine检测得到的仿射不变区域代替固定窗口来改进归一化互相关方法,获得初始匹配点对;通过马氏距离计算超边间的相似度,采用超图约束计算匹配分数对匹配对进行排序;利用分数高的部分匹配点对初始化变换矩阵,通过过滤匹配对来循环更新得到最优变换矩阵实现配准。实验结果表明,该方法具有较好的匹配和剔除错误匹配的效果,在不同类型的图像配准中也有较好的配准效果。  相似文献   
75.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   
76.
分离了AES密码中S盒的仿射变换,得到了与原密码S盒不同的三种等价密码.研究发现列混合矩阵在很大程度上影响仿射变换的提取,在这种意义上提出了对列混合变换的改进建议.  相似文献   
77.
We introduce and study a generalization of the classic sequential testing problem, asking to identify the correct state of a given series system that consists of independent stochastic components. In this setting, costly tests are required to examine the state of individual components, which are sequentially tested until the correct system state can be uniquely identified. The goal is to propose a policy that minimizes the expected testing cost, given a‐priori probabilistic information on the stochastic nature of each individual component. Unlike the classic setting, where variables are tested one after the other, we allow multiple tests to be conducted simultaneously, at the expense of incurring an additional set‐up cost. The main contribution of this article consists in showing that the batch testing problem can be approximated in polynomial time within factor , for any fixed . In addition, we explain how, in spite of its highly nonlinear objective function, the batch testing problem can be formulated as an approximate integer program of polynomial size, while blowing up its expected cost by a factor of at most . Finally, we conduct extensive computational experiments, to demonstrate the practical effectiveness of these algorithms as well as to evaluate their limitations. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 275–286, 2016  相似文献   
78.
We consider a pricing problem in directed, uncapacitated networks. Tariffs must be defined by an operator, the leader, for a subset of m arcs, the tariff arcs. Costs of all other arcs in the network are assumed to be given. There are n clients, the followers, and after the tariffs have been determined, the clients route their demands independent of each other on paths with minimal total cost. The problem is to find tariffs that maximize the operator's revenue. Motivated by applications in telecommunication networks, we consider a restricted version of this problem, assuming that each client utilizes at most one of the operator's tariff arcs. The problem is equivalent to pricing bridges that clients can use in order to cross a river. We prove that this problem is APX‐hard. Moreover, we analyze the effect of uniform pricing, proving that it yields both an m approximation and a (1 + lnD)‐approximation. Here, D is upper bounded by the total demand of all clients. In addition, we consider the problem under the additional restriction that the operator must not reject any of the clients. We prove that this problem does not admit approximation algorithms with any reasonable performance guarantee, unless P = NP, and we prove the existence of an n‐approximation algorithm. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
79.
Maintenance scheduling for modular systems: Modeling and algorithms   总被引:1,自引:0,他引:1       下载免费PDF全文
We study new models of scheduled maintenance management for modular systems, consisting of multiple components with respective cycle limits. The cycle limit of each component specifies the time interval in which this component must be repaired or replaced. The goal is to compute a feasible maintenance schedule that minimizes the cost associated with component maintenance. Applications of these models arise in Air Force aircraft maintenance as well as in other arenas with required preventive maintenance. The typical cost structures that arise in practical settings are submodular, which make the resulting models computationally challenging. We develop two efficient and operationally tenable approximation algorithms. We prove constant factor worst‐case guarantees for both algorithms, and present computational experiments showing that these algorithms perform within a few percent of optimality on operationally relevant instances. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 472–488, 2014  相似文献   
80.
This article introduces the twin robots scheduling problem (TRSP), in which two robots positioned at the opposite ends of a rail are required to deliver items to positions along the rail, and the objective is to minimize the makespan. A proof of ‐hardness of the TRSP is presented, along with exact and heuristic algorithms. Computational results on challenging instances are provided.Copyright © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 119–130, 2014  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号